杂志 道路杂志

关于道路建设的维特根集团数字化杂志

专题文章
Trainees set to work on CORE setup

Hands-on learning, completed together. Our trainees from the Industrial Electronics, Industrial Mechanics and Mechanical Design Engineering programmes have successfully set up the new CORE prototype on Benninghoven’s company premises. And they did so in record time, largely without supervision and while mastering all of the challenges that this kind of project involves.

Training with responsibility

Vögele User training in Windhagen

Machine operators ensure that construction projects are successfully realised with the required precision and efficiency. The Wirtgen Group offers practical training with and on its machines to ensure that users can operate them with absolute confidence right from the start. The asphalt-paving crew from contractor Dr. Fink-Stauf is being ideally prepared for the work on real construction sites at the user-training courses provided by Vögele.

Click here to learn more about user training from Vögele

The AZUBI techdays 2026

This year, Hamm AG invited around 80 trainees from all German brand headquarters to take part in the event in Tirschenreuth. At the three-day event, everything revolved around machines, plants and technologies from the Wirtgen Group product brands. From fascinating theory to practical insights.

A real highlight: the trainees had the opportunity to work independently with the machines and demonstrate their skills on a real construction site.

Visit the AZUBI techdays 2026 online

执着
Asphalt mixing plant in the Alpine Rhine Valley

The implementation and expansion of an asphalt mixing plant in Austria not only creates a more efficient production site but also makes an active contribution to environmental protection.

Benninghoven project in Austria
From Montevideo to the farthest corners of the nation

Three slipform pavers SP 64 from Wirtgen were deployed on a road widening project on one of Uruguay’s most important national highways. A collaborative partnership and efficient machine technology were the key factors in assuring the project’s success.

Read the article
Hamm compactors safeguarding future infrastructure on the construction of the Hochbrücke Horb bridge

A vast-scale construction project is under way in Germany’s south-western Baden-Württemberg region, in the form of the 70 m high Hochbrücke Horb bridge. To ensure the best possible compaction of access tracks and work platforms, two HC 200i – Smart Doc Hamm compactors have been deployed for high transparency and more process reliability

Go to the Hochbrücke Horb bridge article
创新
维特根集团
历史
维特根集团历年 Bauma 展参展盛况一览

2022 年 Bauma 展即将重磅回归,维特根集团将在这里等你!我们带您重温维特根首次在慕尼黑 Bauma 展会上的盛况,并详细解读维特根集团集团展馆从无到有的风采。

现在开始吧 更多历史
维特根集团历年 Bauma 展参展盛况一览

2022 年 Bauma 展即将重磅回归,维特根集团将在这里等你!我们带您重温维特根首次在慕尼黑 Bauma 展会上的盛况,并详细解读维特根集团集团展馆从无到有的风采。

现在开始吧 更多历史
维特根常记于心