Successful deployment on innovative all-electric demolition site
In Erlangen, Franconia, two buildings with a total floor space of around 3300 m² are being demolished. The extraordinary feature: All vehicles and machines are driven electrically.
A new start for the plant in Busswil with the BLS 4 control system
Thanks to the new BLS 4 control system, the asphalt mixing plant in Busswil will continue to reliably produce high-quality rolled asphalt and mastic asphalt.
Warm mix asphalt – the new standard for road construction
As of January 2027, warm mix asphalt will be the new mandatory standard construction method in Germany. Asphalt mixing plants become the crucial factor for successful use of WMA.
For the innovative project "Digital Youngsters – Digitalisation in the Training Workshop", trainees from Kleemann received an award from Allianz Industrie 4.0 Baden-Württemberg.