Expansion of the Berlin ring road: when widening the trans-European motorway, the team frequently had to move between many small job site sections. AutoSet Plus, the automatic functions of the SUPER pavers, provided invaluable support for the paving team.
Long before the idea of the digital construction site, Wirtgen recognised the importance of smart technologies for the improvement of construction processes – solutions that ensure precision and efficiency until the present day.
30 years of 3D machine control: a digital technology that changed the face of construction sites
What began in the mid-1990s with the development of the first 3D interface for slipform pavers is today an integral component of the digital construction process.
VÖGELE present smart solution for digital job-site documentation
WITOS Paving Docu allows paving data and delivery notes to be recorded and automates the sending of job site reports. It is a practical, easy-to-use solution for small and medium-sized construction projects.
The VÖGELE product portfolio of road pavers enables users to cover practically any application in asphalt paving. The range of screeds is correspondingly broad, covering twelve models in up to five different compaction variants.
Genuine Wirtgen Group spare parts are precisely tailored to the requirements of our machines and impress with particularly long service life. To ensure that our customers’ machine fleets are always ready for use, our employees around the world are committed to ensuring that our spare parts are readily and rapidly available.
The 280 SMi delivers full performance in selective mining operations
At the end of 2021, a Wirtgen Surface Miner 280 SMi commenced operation in Kiviõli, an industrial town in northern Estonia. The machine is used for the selective mining of oil shale and limestone.
In the course of the AZUBI techdays 2024, trainees from across the Wirtgen Group showed their skills and talents as they jointly realised a road rehabilitation project with the CTB method on their own.
During the rehabilitation of the Monterey Road in San José (USA), engineering contractor MCK Services, Inc. deployed Wirtgen Group machines and recycled and replaced 42 km of pavement with an overall area of 205,000 m2.