m
The new AB 600 of the Dash 5 generation has a basic width of 3 meters (9.85 ft). Equipped with the robust single-tube telescoping system, its pave width is infinitely variable up to 6 meters (19.7 ft). With the addition of bolt-on extensions, strips as wide as 9.75 meters (31.2 ft) can be paved without joints. With the new Dash 5 highlights, the AB 600 is fit for the future – saving even more time, and optimizing the paving process even more.
Show less| Length |
|---|
| 37.5 cm |
| 75 cm |
| 125 cm |
| Screed | Weight |
|---|---|
| TV | 3,700 kg |
| TP1 | 4,100 kg |
| TP2 | 4,400 kg |
| TP2 Plus | 4,730 kg |
| Screed | Depth |
|---|---|
| AB 600 TV | 1.29 m |
| AB 600 TP | 1.42 m |
| Compacting systems | V |
| Paving width | 0.25 m - 1.80 m |
| Basic width | 0.8 m |
| Compacting systems | V, TV |
| Paving width | 0.50 m - 3.20 m |
| Basic width | 1.1 m |
| Compacting systems | V, TV |
| Paving width | 0.50 m - 3.50 m |
| Basic width | 1.2 m |
| Compacting systems | V, TV |
| Paving width | 0.75 m - 5.00 m |
| Basic width | 1.8 m |
| Compacting systems | TV, TP1, TP2, TP2 Plus |
| Paving width | 2.55 m - 8.50 m |
| Basic width | 2.55 m |
| Compacting systems | TV, TP1, TP2, TP2 Plus |
| Paving width | 2.55 m - 8.75 m |
| Basic width | 2.55 m |
| Compacting systems | TV, TP1, TP2, TP2 Plus |
| Paving width | 3.00 m - 9.50 m |
| Basic width | 3 m |
| Compacting systems | V |
| Paving width | 1.23 m - 5.95 m |
| Basic width | 2.45 m |
| Compacting systems | V |
| Paving width | 1.83 m - 7.75 m |
| Basic width | 3.05 m |
| Compacting systems | V |
| Paving width | 3.05 m - 7.75 m |
| Basic width | 3.05 m |
| Compacting systems | V |
| Paving width | 2.55 m - 5.40 m |
| Basic width | 2.55 m |
| Compacting systems | V |
| Paving width | 3.05 m - 8.60 m |
| Basic width | 3.05 m |
| Compacting systems | V |
| Paving width | 3.05 m - 7.90 m |
| Basic width | 3.05 m |
All details, illustrations and texts are non-binding and may include special equipment. We reserve the right to make technical changes without prior notice. Performance data are dependent upon actual operational conditions.