Warm mix asphalt – the new standard for road construction
As of January 2027, warm mix asphalt will be the new mandatory standard construction method in Germany. Asphalt mixing plants become the crucial factor for successful use of WMA.
The development and construction engineer at Wirtgen provides insights into her varied tasks, career development opportunities and the passion for her job in engineering.
The surface layer and the binder course of a 3.5-km section of the A60 north of Bitburg was rehabilitated with a train of state-of-the-art machines from the Wirtgen Group.
In collaboration with circuit design specialists from the Italian engineering consultants Studio Dromo, the British lead contractor Tarmac wins the race to reprofile and resurface the Silverstone Circuit in time for the British Grand Prix – with Wirtgen Group machines, plants and systems.