A Kleemann plant train has recently started operation for a Brazilian building company. Together with the Ciber mobile asphalt mixing plant, the result is an extremely flexible complete solution.
The 2 km long runway at Tromsø Airport (Norway) was rehabilitated at night because the airport had to remain in operation during the short Arctic summer.
In the Caribbean nation of Trinidad & Tobago, a PRO plant train with MC 120 Z PRO and MCO 11 PRO from Kleemann has been in operation since 2020 for Jusamco Ltd.
Flexible in Recycling with the MOBICAT MC 100 R EVO
To ensure fast arrival at work sites for recycling projects, Freimuth Abbruch und Recycling GmbH decided on the acquisition of a MOBICAT MC 100 R EVO from KLEEMANN.
Asphalt production at the first Benninghoven Recycling Priority Plant (RPP) in Switzerland began in September 2022 – but this was not the only première. The new plant not far from Geneva was also the first of its kind in the country to be equipped with hot gas generator technology.
More than just knowledge of the machines: a wealth of recycling expertise
In-depth knowledge of the application took centre stage at the recycling workshop at Kleemann, where, over 2.5 days, colleagues from all over the world gained new insights and were able to engage in in-depth discussions.
The SUPER 1400 was the first Vögele paver in the world to be fitted with a powerful engine from the group’s parent, John Deere, enabling it to meet India’s more stringent CEV Stage IV emissions standards.
In-place cold recycling of bituminous materials was carried out during a project in Illinois. For this purpose, the contractor selected the 2200 CR recycler with a working width of 3.80 m.
A Ciber iNOVA 1500 supplies the Greater São Paulo Region
The state-of-the-art continuous asphalt mixing plant with a production capacity of 150 t/h enables the use of reclaimed asphalt pavement (RAP) and impresses with a simple operating concept and cutting edge control technology.