Search results

You’ll find an overview of the search results here

Search
Search for "Brochure WIRTGEN Pick GENERATION X²"

1.267 Search results

The Wirtgen Group at Paving Expo 2023 in Brazil
05/04/2023
The Wirtgen Group at Paving Expo 2023 in Brazil

The Wirtgen Group and John Deere will be making a joint appearance at Paving Expo in São Paulo, Brazil, from 24 to 26 May 2023. Under the motto ‘The Future in Roadbuilding – Smart. Safe. Sustainable’, visitors to booth 38 at the show will have an opportunity to gain insights into the company group’s innovative and sustainable solutions.

View article
MINExpo 2016: Wirtgen Group – reliable mining partner
05/07/2016
MINExpo 2016: Wirtgen Group – reliable mining partner

Mining material deposits and processing mineral raw materials imposes high demands on man and machine.

View article
Wirtgen Slipform Paver SP 94i in the USA: A perfectly even runway
Wirtgen Slipform Paver SP 94i in the USA: A perfectly even runway

The new Wirtgen SP 94i slipform paver excels in the reconstruction of a runway in Missouri/USA.

View article
W 220 Fi Mills Road Surface 46 cm Deep
27/10/2020
W 220 Fi Mills Road Surface 46 cm Deep

With Mill Assist, milling operations are carried out particularly cost-effectively. In the process, the Wirtgen Performance Tracker is responsible for the job’s precise documentation.

View article
The Wirtgen Group will be presenting its entire range of product brands at Asphaltica 2024 in Bologna
14/08/2024
The Wirtgen Group will be presenting its entire range of product brands at Asphaltica 2024 in Bologna

The appearance at the show in Bologna from 9 to 12 October 2024 sets a major focus on pioneering technologies, solutions and applications. Visit us at Booth A49 in Hall 19.

View article
Technology Days at the Wirtgen Group India
Technology Days at the Wirtgen Group India

The Wirtgen Group hosted over 1,200 customers, dealers and partners at the Technology Days at their Pune manufacturing facility on 13th and 15th of April, 2023.

View article
Efficient highway rehabilitation
Efficient highway rehabilitation

Knäble GmbH rehabilitates a highway near the French-German border town of Kehl with Wirtgen Group machines.

View article
Texture curing machine TCM 180i from Wirtgen: A handy solution
20/04/2016
Texture curing machine TCM 180i from Wirtgen: A handy solution

Self-propelled curing units, such as the new TCM 180i from WIRTGEN, guarantee the success of professionally cured concrete pavements

View article
Slipform paving with the Wirtgen SP 94i
Slipform paving with the Wirtgen SP 94i

Slipform paving with the Wirtgen SP 94i enables Capital Paving to make the most of project restrictions and improve quality on a paving project on Interstate 44 in Missouri.

View article
Wirtgen Slipform Pavers face the challenge
22/06/2016
Wirtgen Slipform Pavers face the challenge

Ulaanbaatar is the hub for the rising economy and center of expansion for trade and industry.

View article
Stringless concrete paving with the Wirtgen SP 25i and AutoPilot
Stringless concrete paving with the Wirtgen SP 25i and AutoPilot

German construction contractor “VSB infra” takes advantage of the benefits of AutoPilot 2.0 for the paving of a poured in-place concrete safety barrier on the A 43 Autobahn near the city of Münster.

View article
The Wirtgen Group at NordBau 2023 – Smart. Safe. Sustainable.
03/07/2023
The Wirtgen Group at NordBau 2023 – Smart. Safe. Sustainable.

The group’s presence at the show focuses on issues including sustainability, digitalisation, automation and electrification.

View article
Wirtgen Rock Crusher in Dresden
Wirtgen Rock Crusher in Dresden

A WRC 240i Rock Crusher enabled particularly cost-efficient in-situ processing of the terrain for the new trailer port in Dresden.

View article
World premiere of the 280 SM(i) Surface Miner
21/06/2022
World premiere of the 280 SM(i) Surface Miner

World premiere of the 280 SM(i) Surface Miner

View article
WIRTGEN GROUP machines rehabilitate Frankfurter Kreuz motorway junction
WIRTGEN GROUP machines rehabilitate Frankfurter Kreuz motorway junction

Road rehabilitation at the Frankfurt interchange is similar to open-heart surgery. Wirtgen Group machines accomplished the task in less than 57 hours

View article