At the Ludwigsfelde-West intersection, the A10 motorway, which belongs to the southern part of Berlin’s orbital road, is subjected to extreme loads due to heavy traffic. As the pavement had become significantly rutted, the surface and binder courses needed renewing over a length of 4.2 km and a width of approximately 15 m. This placed extreme demands on the paving requirements process: to stop the ruts forming again, the new roadway had to be paved to high standards of quality, load-bearing capacity and durability. Other requirements were to conserve resources, and to reopen the stretch of highway to traffic as quickly as possible.
Photo, right: Two InLine-Pave paving trains from Vögele were used on the A10 simultaneously.