Baseline scenario - Conventional road rehabilitation with Wirtgen Group equipment
Length: 1,000 m
Width: 7.5 m (common for two lanes)
Mobile equipment fuel: Diesel (B7)
Burner fuel: Lignite dust
Asphalt temperature: 160°C
Reclaimed Asphalt Pavement (RAP) ratio: 0%
Mineral moisture: 4%
Disclaimer
¹ All results are estimates and may vary depending on all assumed parameters (in particular, without limitation, Length, Width, Courses, Bitumen content in asphalt, Burner Fuel type, distances and used machines). Our estimates are based on a model-based scenario analysis performed internally at the WIRTGEN GROUP that has not been independently verified. For our estimates we compared performance data of WIRTGEN GROUP equipment, computed from the results of our studies, in the various scenarios indicated above. CO₂e emissions values were based on data originating from various industry sources and may vary according to the source, year, and region: