New standards for milling machines and recyclers for the Asian market

Large milling machine with MILL ASSIST for precision road rehabilitation

Windhagen, 23 November 2026 – Wirtgen expands its portfolio for precise cold milling and comprehensive road rehabilitation with the new large milling machine W 215 P. At Bauma China 2026, the company will also be presenting the new cold recycler WRC 240i as a powerful solution for material recycling applications.

Assistance systems make it easier to work with the W 215 P

The new large milling machine impresses with maximised milling performance and high productivity. In addition, a milling width of 2,000 mm amd a maximum milling depth of 330 mm make the W 215 P the ideal choice for a wide range of different applications. In combination with a range of sensors, the fully integrated LEVEL PRO ACTIVE grade and slope control system fulfils even the most stringent criteria for surface evenness. In automatic mode, the MILL ASSIST machine control system always sets the best balance between milling performance and operating costs. The FCS Light system enables the use of various milling drums with a width of 2.0 m, ensuring outstanding flexibility and full machine utilisation. The assistance systems of the large milling machine help operators with automatic functions that maximise the precision of the milling process. For example, they prevent the side plates sinking into soft ground, help to find the exact start of the second milling cut, automatically align the machine horizontally in transport mode and, if necessary, automatically lift the milling drum when the machine is idling or before reaching obstacles in its path. In addition, the automatic alignment of the machine parallel to the road surface ensures a constant milling depth and reliably compensates for unevenness.

WRC 240i for China’s ‘White-to-Black’ road rehabilitation

In China, the transformation of concrete pavements into asphalted surfaces – or ‘White-to-Black’ – is a common solution widely used for road rehabilitation in urban environments and on rural highways. White stands for the old, rigid cement concrete pavement slabs, while black refers to flexible asphalt concrete surface layers laid down after thorough treatment of the original concrete pavement material. One of the most important machines in this process is a cold recycler, which Wirtgen is now presenting for the first time at Bauma China: the Wirtgen Rock Crusher WRC 240i. The recycler is used for crushing cement concrete pavements that have been broken up beforehand with a hydraulic jack hammer and the in situ recycling of the crushed concrete to produce a CSM (Cement Stabilised Material) road bed. An asphalt surface layer is then paved on this road bed. The powerful crushing and mixing unit of the WRC 240i enables the crushing, mixing and homogenisation of hand packed stone layers, concrete fragments, cobblestones, rocks and stones with a productivity of up to 600 t/h. With a working width of 2.32 m and a maximum working depth of 510 mm, the Rock Crusher impresses with exceptional performance in all soil stabilisation tasks and the in situ processing of a wide range of materials. The concept of the Rock Crusher allows the simultaneous mixing of binding agent (and optionally water) in a single operation during the crushing process.

Production system for recycling

In many situations, road maintenance and repair work produces reclaimed asphalt pavement (RAP), which is generally reused only to a limited extent. Processing using foamed bitumen technology to produce bitumen-stabilised material (BSM) can be carried out at any time by means of the in-plant method in a KMA 240(i) cold recycling mixing plant. In the cold in-place (or in-situ) recycling process, the reclaimed material does not leave the construction site at all, but is processed on the spot and immediately repaved. CR series machines are particularly suitable for this kind of cold recycling. This not only eliminates the need for trucks to make frequent trips to the processing site, but also reduces construction times. Depending on the machine configuration, the material is laid down directly layer-by-layer with an integrated paving screed or by a Vögele paver following on behind. The final compaction is carried out by Hamm rollers. This creates a new, durable and high quality base layer that can withstand future traffic loads.

Media & Press

Click here to download a ZIP file containing the press release in the available languages in Microsoft Word format and the images in 300 dpi resolution.

Download
Web Special

The regular updates on our Web Special keep you up-to-the-minute with the latest news from our appearance at the show as it happens.

The Wirtgen Group at Bauma China 2026
Mario Linnemann and Michaela Adams
WIRTGEN GROUP

Public Relations
Reinhard-Wirtgen-Straße 2
53578 Windhagen
Germany